The Daily Insight

Connected.Informed.Engaged.

Notable postcodes

City / TownPostal CodePost Office
YAB Ketua Menteri Melaka75502Bandar Melaka
YAB Ketua Menteri Sabah88502Kota Kinabalu
YAB Ketua Menteri Sarawak93502Bandar Kuching
YAB Menteri Besar Perlis01502Kangar

What is postal code Umobile?

Jalan Arau. State Name: PERLIS. Postal Code: 01000.

Is Kuala Lumpur a state?

Kuala Lumpur is one of the three federal territories of Malaysia, enclaved within the state of Selangor, on the central west coast of Peninsular Malaysia….

Kuala Lumpur
Establishment1857
City status1 February 1972
Transferred to federal jurisdiction1 February 1974
Government

What is postal code in debit card?

A debit card postal code is related to a card’s cash address. It is the address which you have mentioned on the paper to bank, there is no obstacle in it unless you have changed it or updated the data.

What is second line of address UK?

In the UK. Address Line 1 is your house number and street. Address Line 2 is your locality (ie. a sub section of your town) if you have one.

What are the different codes in Malaysia?

Kuala Lumpur uses codes from 50000 to 60000 (Including a few areas such as Cheras, Taman Melawati, Bukit Lanjan, Pandan Indah which are actually in Selangor) Putrajaya uses codes from 62300 to 62988. Labuan uses codes from 87xxx to 87033.

What is the head of state’s postal code in Malaysia?

Head of state uses codes from xx500 City / Town Postal Code Post Office DYMM Sultan Perak 30500 Ipoh DYMM Sultan Selangor 40500 Shah Alam DYMM Yang Di Pertuan Besar Negeri Sembil 70500 Seremban TYT Yang di-Pertua Negeri Melaka 75500 Melaka

What is the ZIP code for Genting Highlands in Malaysia?

Pahang ( Kuantan) uses codes from 25xxx to 28800, 390xx to 39200 for Cameron Highlands, 49000 for Fraser’s Hill and 69000 for Genting Highlands.

What is the postal code for the Chief Minister of Johor Bahru?

Chief Minister office uses codes from xx502. City / Town. Postal Code. Post Office. YAB Menteri Besar Johor. 79502. Iskandar Puteri. YAB Ketua Menteri Melaka. 75502.